Save
Saving
  • keithvlk

    Thanks for the sheet conversion idea…that is going to come in handy for this.

    As for the 7 layouts, I’m getting a little lost. ( Sorry, new to this whole templater world.) So you’re saying its not possible to send the same 5 dates to 7 different layouts at the same time? I’m fine if I need to manually queue everything. For me, this is just saving me from copy/pasting everything for every venue every month.

    posted in Templates read more
  • keithvlk

    Hey guys,

    Before I purchase templater, trying to make sure I can do what is needed with this plugin. Right now I’m trying to take a data set and spread it across 7 different layouts. The issue is that the data is provided to me in rows (Sample sheet here - https://docs.google.com/spreadsheets/d/1N14IKR5vBFaS2VwDRqlXVQmoNWfa0dHzVznHN1CvcHs/edit?usp=sharing ) and not columns. The final output needs to look something like this (https://drive.google.com/open?id=1NcjAFSHl9Yj6Nue5kjAHzti4POwJp1Ag) and pull multiple rows into the same composition. Is this even possible with this plugin?

    I know this use is a little different than what I see most rigged templates doing, but hoping this is possible.

    edit - I need to do this across 50 venues with varying calendars/tours. Copying/Pasting would be hell,

    posted in Templates read more